Insight3.6

Ready for UAD 3.6 on Day One

A complete UAD 3.6 report writer covering URAR, restricted, and completion reports, with built-in GSE compliance checks and MISMO 3.6 delivery-ready output.

The Challenge

UAD 3.6 Changes Everything About Report Writing

The transition to UAD 3.6 and the redesigned URAR is the largest change to appraisal reporting in a generation.

The Biggest Form Change in Decades

UAD 3.6 replaces the forms appraisers have used for 20 years with a dynamic, data-driven report. Old workflows and templates simply don't carry over.

GSE Compliance Isn't Optional

Fannie and Freddie will enforce UAD 3.6 requirements at delivery. Errors that used to slide now hard-stop the loan file.

MISMO 3.6 Delivery

Reports must be delivered as MISMO 3.6 XML, not PDFs of old forms. Producing valid, delivery-ready output takes purpose-built software.

The Solution

How Insight3.6 Gets You Delivery-Ready

Complete UAD 3.6 Report Writer

  • URAR reports
  • Restricted reports
  • Completion reports
  • One writer for every UAD 3.6 assignment

Built-In GSE Compliance Checks

  • Requirements validated during the work
  • Issues flagged before delivery, not after
  • Fannie and Freddie rules embedded
  • Fewer hard stops and revision requests

Dynamic, Data-Driven Workflow

  • Report scope adapts to the property
  • Guided data collection
  • Consistent structure across the panel
  • No obsolete form templates

MISMO 3.6 Delivery-Ready Output

  • Valid MISMO 3.6 XML output
  • Delivery-ready on export
  • Aligned to GSE submission requirements
  • Ready for day one of the transition
How It Works

4 Steps from Assignment to Delivery

1

Start the Assignment

Select the report type, URAR, restricted, or completion, and scope the work

2

Complete the Report

Work through the dynamic, guided UAD 3.6 workflow

3

Pass the Checks

Built-in GSE compliance checks catch issues while you work

4

Deliver

Export MISMO 3.6 delivery-ready output, ready for submission

Be Ready Before the Deadline

See how Insight3.6 makes the UAD 3.6 transition a workflow change, not a crisis.